AssistantManagement
Turn one outline into a whole task tree
A manager describes the work once, as parent tasks and a template of stages with subtasks; the assistant unfolds it into the full tree, takes owners, dates and estimates in plain words, shows exactly what will be created, and files it all in the tracker after one confirmation.
Updated
Before you start
- What you need
- Your task tracker, the project you are filling, and the outline of the work: parent tasks and the stages each one goes through.
- Connector (MCP)
- Recommended. It reads the project's components, releases and required fields, and creates the tasks once you confirm the summary.
- Without a connector
- Without it, you get the same tree and summary as an import file for your tracker's bulk import. You still skip the typing; you do the upload.
A connector, often called MCP, lets an assistant read your tools directly instead of you pasting. Set it up once, then it reads those tools on its own. How that is done differs per assistant, so check its own documentation.
How to try it
- Download the skill and unzip it. Inside are the instruction, the outline, summary and report templates, and a page on loading it.
- If your assistant reads skills, copy the tracker-task-tree folder into the place it reads them from. If it does not, use Copy as text instead: that is the same instruction with the templates already inlined.
- Try it on a small test project first: two parents, one stage, two subtasks.
- Check that the summary's count matches the arithmetic, that an empty estimate stays empty, and that every task in the report opens.
- Then write the outline for a real batch. It does the typing; you own the plan.
Download to install it once. Copy to paste it into a chat.